Spillway Renewal

Castell Nos

Spillway Renewal

Directional Drill Crossing

Codford to Camphill

Directional Drill Crossing

Flood Alleviation Scheme

Pontsticill

Flood Alleviation Scheme

Lewis Civil Engineering

www.lewis-ltd.co.uk

Lewis Civil Engineering

Humus Tank Base Cast

Leyhill

Humus Tank Base Cast

Cross County Pipeline

Construction of Wessex Water Integrated Grid Project

Cross County Pipeline

Service Reservoir

Goulds Hill

Service Reservoir

Cross Country Pipeline

Coker Hill

Cross Country Pipeline

Tank

Oakford Spring

Tank

Precast Chamber

Ringwood WTW

Precast Chamber

Y&P Sewer Crossing

Castell Coch

Y&P Sewer Crossing

Shaft Works

Burnham

Shaft Works
Neath Abbey

Neath Abbey

Sewer upgrading: Existing sewer's capacity unable to handle irregular heavy flows. Additional storage was installed.

Neath Abbey

Bryn Afon Road

Bryn Afon Road

Underground Sewage Storage Tanks: Construction of overflow sewage storage tanks.

Bryn Afon Road

Ringwood

Ringwood

Treatment Works Scheme: Increase the quality of the final effluent discharge from the treatment works.

Ringwood

Brompton Regis

Brompton Regis

Improvement of the existing Booster Station both to increase the maximum pass forward rate during peak periods and to update the existing failing asset.

Brompton Regis

Stoke Gifford

Stoke Gifford

The Stoke Gifford scheme was located in the grounds of the Bristol Technology and Engineering Academy in North West Bristol.

Stoke Gifford